EYVANایوان
Visualisation of a two-storey brick house, rendered from the Revit model

BIM Studio · Milano · Architecture · Structure · MEP

Revit models and drawing sets, from your CAD or PDF.

Extra BIM capacity for architecture and engineering offices in Italy and across Europe. Models, sheets, families and clash checks, delivered in your template and your Revit version.

16 Farmcote Road · 52 sheets
201sheets across the five latest drawing sets
3disciplines in one model: architecture, structure, MEP
0Revit warnings at delivery
24 hto a quote and a delivery date

Team experience at (as employee or student, before EYVAN)

  • Politecnico di MilanoBIM team project
  • BIM consultancyAutodesk partner · Milan
  • Structural engineering studiostructural BIM · Milan
  • Sustainable building companyquantities · Monza
  • Building contractorsite drawings · Milan
  • Engineering firmconstruction & BIM · Milan

Services

What the studio delivers

For offices that need more Revit hands for a deadline, a competition or a busy month, without hiring.

G-001
CAD / PDF → RVT

Revit modelling

Architectural and structural models from CAD files, PDFs or sketches, at the LOD you need, in your template.

PLANS · SECTIONS · DETAILS

Drawing sets

Sheets on your title block: plans, elevations, sections, details, schedules and quantities, ready to issue.

MEP · .RFA

MEP models & families

Plumbing, heating and ventilation down to valves and fittings, plant rooms, and parametric families with connectors.

.RCP / .E57

Scan to BIM

Models of existing buildings from point clouds, for renovation and heritage work.

NWD · CLASH

Model checks

Clash detection in Navisworks, warning clean-up and model audits before you issue.

BEP · 4D · 5D

BIM coordination

BIM Execution Plans, 4D scheduling and 5D quantities set up on your project.

Selected work

Projects modelled end to end in Revit

Open a project to see what was modelled, the sheets it produced and the drawing index. Work done for employers is described rather than shown, because those files belong to the firms.

A-100

Revit structural models

Structural engineering studio · Milan · 2025–26

Structural modelling in Revit, detailing in AutoCAD, clash detection in Navisworks, 5D and P6 scheduling, BIM Execution Plans.

BIM implementation

BIM consultancy · Milan · 2024–25

BIM consulting and BEPs for clients of an Autodesk partner, plus team training on BIM tools and processes.

Drawings on live sites

Building contractor · Milan · 2026–

Construction drawings in AutoCAD and Revit, quantities and progress monitoring as site manager.

How it works

How a job runs

Clear scope before any modelling starts, and you see progress while it happens.

G-002
  1. Send the files

    CAD, PDF, sketches or a point cloud, with your template and deadline.

  2. Quote within 24 hours

    A fixed price or hourly estimate, with a delivery date.

  3. Model with updates

    Progress shared every one to two days, so changes stay small.

  4. Delivery

    RVT in your Revit version, plus PDF and DWG exports.

First time working together? Start with a small trial task at a reduced rate and judge the result before committing to more.

Studio

Behind EYVAN

G-003

EYVAN is run by Ehsan Ahmadghondaghsaz, a building engineer in Milan with a Master's in Management of Built Environment from Politecnico di Milano. Years on construction sites shape how the models are built: they have to work for the people who build from them. The name comes from the eyvan, the vaulted hall that opens onto a Persian courtyard.

  • 2026 – now
    Construction Project ManagerBuilding contractor, Milan
  • 2025 – 2026
    BIM SpecialistStructural engineering studio, Milan
  • 2024 – 2025
    BIM & Digitalisation ConsultantBIM consultancy, Milan
  • 2024
    Construction & BIM SpecialistEngineering firm, Milan
  • 2017 – 2021
    Construction Project ManagerConstruction company, Tehran

Software

RevitNavisworksAutoCADDynamoCivil 3DETABSPrimavera P6MS ProjectACCA PriMusPython

Working terms

Partita IVA, EU VAT registeredRemote across EuropeOn-site in LombardyEN · IT · FA

Education

MSc Management of Built Environment, Politecnico di Milano
BSc Civil Engineering

Contact

Have a deadline coming up?

Send the drawings you have and the date you need them. You get a quote and a delivery date within 24 hours.

G-004
LinkedIn
EYVAN Studio
Studio
Milan, Italy · remote or on-site
Files
DWG, PDF, RVT, IFC, point clouds. Upload up to 25 MB with the form; larger files by WeTransfer or a shared folder link.
Goes straight to the studio. Larger files: put a WeTransfer link in the message.

16 Farmcote Road

Residential · Toronto, Canada · October 2026 · Revit 2027

A two-storey flat-roof brick house in Toronto with a basement, a double garage, a walk-out and a pool terrace. Re-modelled in Revit 2027 from the issued permit set on an Ontario template, then carried through every discipline: architecture, structure, plumbing, HVAC, electrical and site. 52 sheets, 0 Revit warnings and 0 hard clashes between systems at delivery, LOD 300–350.

  • Architecture: site plan, floor and roof plans, 4 elevations, sections, wall sections at 1:20, reflected ceiling plans, interior elevations, door, window, room and finish schedules, life-safety and area plans, material take-off.
  • Structure: TJI floor and roof joists, LVL and steel beams, posts and footings; framing plans per level with notes and member schedules.
  • Plumbing and HVAC: water, drain-waste-vent and gas to 26 fixtures; ductwork sized room by room from a heating and cooling load calculation; riser and duct isometrics.
  • Electrical: 88 luminaires, 120 devices, 37 circuits, panel schedule and load calculation. Renders from the model, IFC and DWG exports.
Revit 2027ArchitectureStructureMEP52 sheetsLOD 300–350

Drawing index (extract)

  • A2 First floor plan
  • A5–A8 Elevations
  • A9 Building sections
  • A17 Wall sections 1:20
  • A15 Reflected ceiling plans
  • S-2 Second floor framing
  • P-2 Plumbing, first floor
  • P-4 Plumbing riser isometric
  • M-2 HVAC, first floor
  • M-4 Duct isometric
  • M-5 Heating and cooling loads
  • E-2 Electrical, first floor
  • E-4 Panel schedule and load calc
Street view rendered from the Revit model
Street view, Revit render
Aerial render from the Revit model
Aerial view, Revit render
Rear garden and pool render
Rear garden and pool, Revit render
Sheet A2, first floor plan
A2 · First floor plan
Sheet A9, building section
A9 · Building section
Sheet A17, wall sections
A17 · Wall sections 1:20
Sheet S-2, second floor framing
S-2 · Second floor framing
Sheet M-4, duct isometric
M-4 · HVAC duct isometric
Sheet P-4, plumbing riser isometric
P-4 · Plumbing riser isometric
Sheet E-2, electrical first floor
E-2 · Electrical plan, first floor
Kitchen render
Kitchen and family room, Revit render

Two-storey load-bearing masonry building

Structural design · Turin, Italy · November 2026 · Revit 2027

Our own demonstration of a complete structural BIM workflow on a typical Italian palazzina: two storeys and an attic on a 12 × 9 m plan, solid-brick bearing walls, reinforced-concrete ring beams and lintels, 20+4 clay-block floors, a concrete stair and a timber roof. Modelled in Revit 2027 with a connected analytical model, loads and combinations to NTC 2018, then delivered as 11 A1 sheets in Italian, a preliminary calculation report, an IFC 2x3 file for structural analysis software and a bill of quantities. LOD 400 (LOD E, UNI 11337-4).

  • Structure: bearing walls modelled as structural walls with openings aligned floor to floor, ring beams, lintels, strip foundations, floors and stair, with the analytical model connected throughout.
  • Reinforcement: ring beams, lintels, foundations, stair and floors reinforced in Revit, 279 bars, with bar schedules taken straight from the model.
  • Timber roof: glulam ridge beam and C24 rafters with steel connections; 345 bolts and anchors modelled, including the ties between masonry and ring beams.
  • Design: loads and seismic action to NTC 2018 and Circolare 2019, the simple-building check, wall stresses and slenderness, ring beam, lintel, foundation and roof checks, all in an Italian calculation report. Every check passes.
  • Delivery: zero Revit warnings and zero clashes; the IFC was checked class by class before export, together with DWG sheets and quantities.
Revit 2027StructureRebarNTC 2018IFC 2x311 sheetsLOD 400

Drawing index (extract)

  • S-01 Foundation plan
  • S-02 Ground floor structural plan
  • S-04 Sections A-A and B-B
  • S-05 Structural 3D and analytical model
  • S-06 Wall, opening, ring beam and lintel schedules
  • S-07 Loads and combinations
  • S-08 Ring beam, lintel and foundation reinforcement
  • S-09 Stair and floors: formwork and reinforcement
  • S-10 Timber roof and steel connections
Timber roof over the reinforced masonry structure, Revit model
Glulam and C24 timber roof over the reinforced structure
Exploded 3D view of all reinforcement
Every bar in Revit: foundations, ring beams, floors
Reinforced concrete stair with rebar
RC stair with its reinforcement
Ring beam and lintel reinforcement inside the wall
Ring beam and lintel cages inside the masonry
Timber post node with steel plate and anchors
Timber post node: steel plate, anchors, footing rebar
Analytical structural model
Connected analytical model
Structural model, axonometric view
Structural model, axonometric
Sheet S-02, ground floor structural plan
S-02 · Ground floor structural plan
Sheet S-04, sections
S-04 · Sections A-A and B-B

5,000 m³ reservoir and pumping station

Water infrastructure · Iran · October 2026 · Revit 2027

A water pumping station: a buried two-cell reinforced-concrete reservoir of 5,000 m³, a pump house with a steel portal roof, a disinfection building, inlet and outlet pits, retaining walls and the access road. Re-modelled in Revit 2027 from the issued tender drawing album, on the client's own sheet template and to the national codes, then delivered as one PDF with a priced bill of quantities and the structural calculation report. 63 A1 sheets, LOD 400.

  • Structure: every slab, wall, column and column capital reinforced in Revit, with bar marks and bar-bending schedules taken straight from the model; reservoir underdrainage, manholes and pits.
  • Steel: pump-house portal frames, purlins, sag rods and bracing, with base plates, end plates and bolts modelled.
  • Architecture and site: plans, sections, elevations, doors and windows, topography, platforms, road and kerb details on survey coordinates.
  • Electrical: single-line diagrams of the main and lighting panels, building lighting and sockets, fire alarm, site lighting poles, cable routes and trenches, lightning protection, earthing and the generator fuel system.
  • Quantities priced on the official base price lists and a 184-page structural design report. Every sheet was checked side by side against the source album before delivery.
Revit 2027StructureArchitectureElectricalRebar63 sheetsLOD 400

Drawing index (extract)

  • ST-A72 Reservoir floor formwork plan
  • ST-A75 Reservoir floor reinforcement
  • ST-A77 Wall reinforcement W1 and W2
  • ST-A7C Bar schedules from the model
  • ST-A6C Steel roof details
  • AR-A9E Site plan on survey grid
  • AR-AA6 Pump house plan
  • EL-A80 Main single-line diagram
  • EL-A88 Site lighting
  • EL-A8C Earthing system
Reservoir cut-away showing the full reinforcement modelled in Revit
Reservoir cut-away: every bar modelled in Revit
Whole pumping station site, Revit model
Whole site from the Revit model
Pump house with the roof cut open to show the steel frame
Pump house: roof cut open to show the steel frame
Reservoir cut below the roof
Reservoir cut below the roof: two cells
Pump house and disinfection building
Pump house and disinfection building
Pump pit reinforcement modelled in Revit
Pump-pit reinforcement in Revit
Wall and floor corner reinforcement
Wall and floor corner reinforcement in Revit
Sheet ST-A75, reservoir floor reinforcement
ST-A75 · Reservoir floor reinforcement
Sheet ST-A6C, steel roof details
ST-A6C · Steel roof details

Common Ground, Toronto workplace fit-out

Sample project · Ontario, Canada · October 2026 · Revit 2027

A full-floor tenant fit-out in a downtown Toronto tower, designed and documented the way a large integrated Canadian practice's interiors team works: a daylit living room at the arrival, a café that doubles as town hall, library and focus rooms at the edges, and open team neighbourhoods along the south glazing.

  • 1,146 m² net, 38 rooms, 66 sit-stand workstations, boardroom for 16, three meeting rooms, library, wellness and mothers' rooms, universal washroom to OBC 3.8.
  • 22 ID sheets: partition, furniture, finish, ceiling and power/data plans, 14 interior elevations, partition and ceiling details, millwork, door, finish and FF&E schedules, OBC 2024 code matrix.
  • Low-carbon palette (FSC white oak, cork, wool, Ontario limestone) with LEED v4.1 ID+C Gold and WELL v2 targets written into the finish schedule.
  • Automated QA on the whole model: zero Revit warnings, every room enclosed, every view on a sheet.
Revit 2027Interior designFF&EOBC 202422 sheets

Drawing index (extract)

  • ID-001 General notes & OBC code matrix
  • ID-101 Partition plan
  • ID-102 Furniture plan
  • ID-103 Finish plan
  • ID-104 Reflected ceiling plan
  • ID-201 Interior elevations, reception
  • ID-301 Partition types P1–P5
  • ID-401 Millwork, reception desk
  • ID-502 Room finish schedule
  • ID-503 FF&E schedule
Cut-away axonometric of the whole floor
Cut-away axonometric of the whole floor
Open office and collab island
Open office and collab island
ID-000 cover and drawing index
ID-000

27 Denham Drive, Richmond Hill

Client project · Ontario, Canada · October 2026 · Revit 2027

A three-storey brick house with a basement garage and car lift, a walk-out lower level, balconies and a mansard roof with dormers. Rebuilt in Revit from the architect's 20-page metric PDF, with the structural package laid out in the style of a Toronto permit set.

  • Four levels, 94 rooms, 66 doors, 57 windows, spiral and straight stairs, elevator and car lift.
  • Strip and pad footings, HSS columns, steel and LVL framing, 19 structural details, column, footing, beam and lintel schedules.
  • Site plan, plans, ceiling plans, 4 elevations, 3 sections, wall sections, 35 details, 23 schedules, OBC 2024 matrix, mechanical, plumbing and electrical layouts.
  • Automated QA on the whole model: zero Revit warnings, every room enclosed, every view on a sheet.
Revit 2027ArchitectureStructureMEP44 sheets

Drawing index (extract)

  • A-000 Cover sheet & index
  • A-001 General notes & OBC matrix
  • A-100 Site plan
  • A-101 Ground floor plan
  • A-201 North elevation
  • A-301 Building section
  • A-401 Wall sections
  • A-501 Spiral stair details
  • A-601 Door & window schedules
  • S-000 Structural notes & loads
  • S-100 Foundation plan
  • S-201 Structural details
  • S-301 Structural schedules
  • M-101 Mechanical, ground floor
  • P-101 Plumbing & riser
  • E-101 Electrical, lower levels
Garden side with walk-out and balconies
Garden side with walk-out and balconies
Foyer and spiral stair
Foyer and spiral stair
A-000 cover and drawing index
A-000

Iranian courtyard house

Studio project · Milan · October 2026 · Revit 2027

A two-storey brick house around a courtyard with a hoz (pool), an eyvan on two columns and a roof penthouse. One coordinated model carries architecture, structure and MEP, and the full drawing set comes straight from it.

  • Strip and pad foundations, RC columns, steel beams and slabs on shared grids and levels.
  • Full MEP: DN100 stack in a corner shaft vented to the roof, traps and angle valves at every fixture, plant room with boiler and 3 heating circuits to 11 radiators, zero open connectors.
  • Wall sections, stair and structural connection details, door, window and room schedules.
  • Dimension chains on every plan and section, every element tagged, zero warnings.
Revit 2027ArchitectureStructureMEP31 sheets

Drawing index (extract)

  • A-000 Cover sheet & index
  • A-101 Site plan
  • A-102 Ground floor plan
  • A-103 First floor plan
  • A-104 Roof plan
  • A-201 Courtyard elevation
  • A-301 Section A-A
  • A-601 Door, window & room schedules
  • A-701 Wall section & details
  • E-101 Power, ground floor
  • M-101 Mechanical, ground floor
  • P-103 Plumbing isometric
  • S-101 Foundations & columns
  • S-201 Structural section
  • S-402 Steel connection details
Full 3D model: house and courtyard
Full 3D model: house and courtyard
Ground floor cut-away
Ground floor cut-away
MEP only: plumbing, heating, ventilation
MEP only: plumbing, heating, ventilation
Bathroom with every fixture connected
Bathroom: every fixture connected
Plant room: boiler and 3 circuits
Plant room: boiler and 3 circuits
Plumbing isometric with sizes
Plumbing isometric with sizes

Boiler room to valves and fittings

Sample project · Milan · October 2026 · Revit 2027

A plant room modelled the way MEP engineers need it: two boilers, hydraulic separator, expansion vessel and a four-circuit manifold with pumps, every fitting and valve in place.

  • Pipes DN50 to DN100 with real elbows, tees, reducers, valves and check valves.
  • Separate systems with colours: supply, return, hot and cold water, supply and return air.
  • 3D views, plan and section A-A at 1:50 with tags and sizes, straight from the model.
Revit 2027MechanicalPlant roomValves & fittings
Boilers, separator, manifold with pumps
Boilers, separator, manifold with pumps
3D section: tanks, boilers, ducts
3D section: tanks, boilers, ducts
Section A-A, 1:50
Section A-A · 1:50

Reinforced-concrete building: demolition and new build

Politecnico di Milano · BIM team project · 2022/23

A multi-storey RC building replacing an existing structure, modelled floor by floor from 2D AutoCAD plans, then scheduled and checked in Navisworks.

  • Foundations, columns, walls and slabs, then the full architectural layer.
  • Demolition volume and site layout: crane, scaffolding and site cabins as Revit families.
  • WBS parameters on every element for quantity take-off and a 4D TimeLiner simulation.
  • The first structural clash run found 88 clashes; after corrections the model was clash-free.
RevitNavisworks Manage4D / 5DPrimavera P6
Structural model
Structural model
4D TimeLiner
4D TimeLiner
Site layout
Site layout

Residential villa and steel roof quantities

Monza · 2023

A phased Revit model of a residential villa used for quantity take-off, PriMus cost estimates and scheduling, alongside a computo metrico for the steel carpentry of the lower and upper roofs.

RevitACCA PriMusMicrosoft ProjectComputo metrico
Villa, 3D view
Villa, 3D view
Phase view
Phase view
PriMus bill of quantities
PriMus bill of quantities